Power Engineering
Power lines, substations and generation facilities, 110–220 kV.
About the direction
The company performs general construction and electrical works with its own engineering teams, builds power lines and substations across voltage classes, and supplies specialist equipment, machinery and consumables. INTEGRA’s experience includes 110–220 kV facilities and more than 500 MW of energy capacity.
What we do
- 110–220 kV transmission lines
- Substations and switchgear
- Solar and hydro power plants
- Overhaul of hydro units
- Supply of equipment and machinery
500+MWof energy capacity
110–220kVvoltage classes of lines and substations
32km220 kV line, Issyk-Kul
Projects in this direction
Where this expertise works
Kambarata HPP-2, Design
Design works for the Kambarata-2 hydropower plant.

220 kV Transmission Line and Substation Expansion — Issyk-Kul
A 32 km 220 kV overhead line and substation expansion to evacuate the output of the solar power plant.

Unigreen Solar Power Plant (SPP), 300 MW
A 300 MW solar power plant on the northern shore of Issyk-Kul — one of the largest renewable energy facilities in Kyrgyzstan.