220 kV Transmission Line and Substation Expansion — Issyk-Kul

220 kV Transmission Line and Substation Expansion — Issyk-Kul

Client
Unigreen Energy
Country
Kyrgyzstan
City / region
Issyk-Kul Region
Year
2026
Status
Completed
Contract type
EPC (turnkey)

A 32 km 220 kV overhead line and substation expansion to evacuate the output of the solar power plant.

220kVvoltage class
32kmline length
  1. Design adjustment, state expertise approval and permitting
  2. Construction of 32 km of 220 kV overhead line
  3. Foundation works and tower erection
  4. Installation of conductors, insulators and grounding systems
  5. Expansion and reconstruction of 220 kV outdoor switchgear
  6. Testing, commissioning and as-built documentation