About the project
A 32 km 220 kV overhead line and substation expansion to evacuate the output of the solar power plant.
220kVvoltage class
32kmline length
Scope of works
- Design adjustment, state expertise approval and permitting
- Construction of 32 km of 220 kV overhead line
- Foundation works and tower erection
- Installation of conductors, insulators and grounding systems
- Expansion and reconstruction of 220 kV outdoor switchgear
- Testing, commissioning and as-built documentation