About the project
A 300 MW solar power plant on the northern shore of Issyk-Kul — one of the largest renewable energy facilities in Kyrgyzstan.
INTEGRA Engineering Group is the general contractor: from site organisation and the construction camp to commissioning. The plant occupies 582 hectares. To evacuate the power, the company built a 220 kV overhead line and expanded the substation.
300MWinstalled capacity
582hasite area
220kVpower evacuation
2026completion
Scope of works
- Full construction, installation and commissioning works
- Site organisation and construction camp setup
- Construction supervision and quality control
- Provision of machinery, certified equipment and testing services
- Logistics, material handling and full HSE compliance
- Development of method statements and preparation of as-built documentation